Our Track Record

Selected References: 75+ projects across 4 countries

Explore a curated selection of our bioclimatic modeling, energy audits, and dynamic thermal simulations carried out in Tunisia, France, Senegal, and Ivory Coast.

TN Projects in Tunisia

01 — SEACNVS — Head Office
Taparura, Sfax

2011–2013

Plan-phase energy audit

APS · APD · Tender · Final verification

Application of the Tunisian thermal regulation across all project phases.


Energy efficiency actions Costing of passive and active measures · Support to the client and ANME for subsidies.

02 — SBF — New Headquarters
Charguia I, Tunis

2018–2022

−42 % simulated annual energy consumption

Thermal simulation · EE actions · Execution · Commissioning


After two years of operation: Consumption tracking across all trades, theoretical vs. actual comparison, and mitigation of energy losses.

INTL International Projects (France, Senegal, Ivory Coast)

04 — Boucry Building
Paris

2023–2024

Energy audit · Tertiary Eco-Energy Decree

  • −40 %2030
  • −50 %2040
  • −60 %2050

Regulatory trajectory for mandatory energy consumption reduction.

05 — Campus-ISM
Dakar

2020–2022

≈ 11,000 m²Thermal and energy study


Envelope optimization · solar shading · passive energy performance.

06 — Intelligent Transportation
System « ITS »
Interurban — Abidjan

2023–2025

−20 % simulated annual electrical consumption


152,630 kWh/year of simulated energy savings


−45 % cooling and ventilation capacity

Engineering missions that combine scientific expertise, dynamic simulation, design support, and performance verification.

Planning a similar project?

Benefit from our 29 years of specialized engineering and architectural expertise.

Contact us